  CCB Home
Added by Richard Dubois, last edited by Richard Dubois on Jul 28, 2006  (view change)
Labels: 
(None)

Introduction

The software comprising the pipeline and what it runs is under configuration control for the remainder of the GLAST Beam test period. After baselining the code, all modifications to the running code will need to be approved by the Change Control Board. The purpose of configuration control is to understand the code content that affects processing results, and to maximize system uptime by vetting changes that affect reliability.

CCB Actions List

Title Author Date Posted
CCB update p9 pipeline Francesco Longo Sep 22, 2006 12:24
CCB update 20060922 Francesco Longo Sep 22, 2006 08:59
CCB Update 20060817 Francesco Longo Aug 17, 2006 09:32
CCB Update 20060808 Richard Dubois Aug 08, 2006 10:08

 

 Process

Proposed changes will be recorded in the CCB with an explanation of the need, changes and consequences. These will be recorded in blogs in this confluence space.  We will start off by requiring documentation of the new state of the pipeline and results of systems tests.

The need should be recorded in JIRA issues, with a trail through to resolution of the issue.

The software under control is the pipeline itself (database, pipeline code and user interfaces) and all scripts and executables run by the pipeline. This includes online, svac and SAS code.

BeamTestRelease package

Inclusion of the tagged packages will be proposed to the gatekeeper (Michael Kuss) who will prepare new releases. These are based on tested GlastRelease releases as much as possible. System tests will be run.

Other elements

The svac scripts and pipeline front and back ends are more procedural pieces, not affecting the results; only the operability of the system.